ODOT Fiber Expansion

Description

This project will expand fiber on ODOT facilities to connect additional devices. Dedicated conduits for future ITS needs are been placed in freeway barrier walls as part of reconstruction projects.

Status: Planned

Timeframe: Long

Stakeholders

ODOT

Inventory

ODOT ATMS
ODOT District 2 CCTV Cameras
ODOT District 2 DMS
ODOT District 2 Office
ODOT District 2 RWIS Stations

Services

TM01–Infrastructure–Based Traffic Surveillance (ODOT District 2)
TM06–Traffic Information Dissemination (ODOT District 2)
WX01–Weather Data Collection (ODOT District 2)

Interfaces

SourceFlowDestinationStatus
ODOT ATMSenvironmental sensors controlODOT District 2 RWIS StationsPlanned
ODOT ATMSroadway dynamic signage dataODOT District 2 DMSPlanned
ODOT ATMSvideo surveillance controlODOT District 2 CCTV CamerasPlanned
ODOT District 2 CCTV Camerastraffic detector dataODOT District 2 OfficePlanned
ODOT District 2 CCTV Camerastraffic image meta dataODOT ATMSPlanned
ODOT District 2 CCTV Camerastraffic image meta dataODOT District 2 OfficePlanned
ODOT District 2 CCTV Camerastraffic imagesODOT ATMSPlanned
ODOT District 2 CCTV Camerastraffic imagesODOT District 2 OfficePlanned
ODOT District 2 DMSroadway dynamic signage statusODOT ATMSPlanned
ODOT District 2 DMSroadway dynamic signage statusODOT District 2 OfficePlanned
ODOT District 2 Officeenvironmental sensors controlODOT District 2 RWIS StationsPlanned
ODOT District 2 Officeroadway dynamic signage dataODOT District 2 DMSPlanned
ODOT District 2 Officetraffic detector controlODOT District 2 CCTV CamerasPlanned
ODOT District 2 Officevideo surveillance controlODOT District 2 CCTV CamerasPlanned
ODOT District 2 RWIS Stationsenvironmental sensor dataODOT ATMSPlanned
ODOT District 2 RWIS Stationsenvironmental sensor dataODOT District 2 OfficePlanned